dc.description.abstract |
[spa] En este Trabajo de Final de Grado se realiza el seguimiento de obra de un proyecto de Reforma
y ampliación de vivienda unifamiliar aislada existente en suelo rústico y nueva planta de piscina.
Previamente a dicho seguimiento, se realiza un análisis de la documentación previa al inicio de
las obras. Dicha documentación se compone del Proyecto Básico y de Ejecución, del Estudio de
Seguridad y Salud y, del Plan de Seguridad y Salud. El análisis de esos documentos se realiza
desde el punto de vista de un Director de Ejecución de Obra y/o de un Coordinador de Seguridad
y Salud, con el objetivo de comprobar que no haya errores graves o incoherencias, algo que
supondría un problema durante el transcurso de las obras. Analizada la documentación
correspondiente, se procede al seguimiento de la obra mediante la redacción de actas que
recogen la información, tanto escrita como gráfica, de las visitas semanales, además de un breve
análisis económico y de control de calidad de la obra vista durante la redacción de este Trabajo. |
|
dc.description.abstract |
[eng] On this Degree Final Project the follow-up work of the Reform and Extension project of both a
single-family, detached house in rural land and a new swimming pool is analyzed.
Prior to this monitoring, an analysis of the documentation needed to start the construction is
carried out. Such documentation consists of the Basic and Execution Project, the Health and
Safety Study and the Health and Safety Plan. The analysis of these documents is carried out from
the point of view of a Construction Execution Director and/or a Health and Safety Manager. The
aim is checking that there are no serious errors or inconsistencies because these would imply
problems during the project. Once the given documentation is examined, The follow-up work is
analyzed by writing down minutes which include both written and graphic information regarding
weekly visits, as well as a brief economic and quality-control analysis of the construction. |
|
dc.format |
application/pdf |
|
dc.language.iso |
spa |
|
dc.publisher |
Universitat de les Illes Balears |
|
dc.rights |
all rights reserved |
|
dc.rights |
info:eu-repo/semantics/openAccess |
|
dc.subject |
62 - Enginyeria. Tecnologia |
|
dc.title |
Seguimiento de obra de una vivienda unifamiliar aislada existente en suelo rústico y nueva planta de piscina |
|