Seguimiento de obra de una vivienda unifamiliar aislada existente en suelo rústico y nueva planta de piscina

Show simple item record

dc.contributor Forteza Oliver, Francisco José
dc.contributor Estudillo Gil, Bárbara
dc.contributor.author Torres Gómez, Rafael
dc.date 2018
dc.date.accessioned 2020-03-24T10:31:03Z
dc.date.available 2020-03-24T10:31:03Z
dc.identifier.uri http://hdl.handle.net/11201/151682
dc.description.abstract [spa] En este Trabajo de Final de Grado se realiza el seguimiento de obra de un proyecto de Reforma y ampliación de vivienda unifamiliar aislada existente en suelo rústico y nueva planta de piscina. Previamente a dicho seguimiento, se realiza un análisis de la documentación previa al inicio de las obras. Dicha documentación se compone del Proyecto Básico y de Ejecución, del Estudio de Seguridad y Salud y, del Plan de Seguridad y Salud. El análisis de esos documentos se realiza desde el punto de vista de un Director de Ejecución de Obra y/o de un Coordinador de Seguridad y Salud, con el objetivo de comprobar que no haya errores graves o incoherencias, algo que supondría un problema durante el transcurso de las obras. Analizada la documentación correspondiente, se procede al seguimiento de la obra mediante la redacción de actas que recogen la información, tanto escrita como gráfica, de las visitas semanales, además de un breve análisis económico y de control de calidad de la obra vista durante la redacción de este Trabajo.
dc.description.abstract [eng] On this Degree Final Project the follow-up work of the Reform and Extension project of both a single-family, detached house in rural land and a new swimming pool is analyzed. Prior to this monitoring, an analysis of the documentation needed to start the construction is carried out. Such documentation consists of the Basic and Execution Project, the Health and Safety Study and the Health and Safety Plan. The analysis of these documents is carried out from the point of view of a Construction Execution Director and/or a Health and Safety Manager. The aim is checking that there are no serious errors or inconsistencies because these would imply problems during the project. Once the given documentation is examined, The follow-up work is analyzed by writing down minutes which include both written and graphic information regarding weekly visits, as well as a brief economic and quality-control analysis of the construction.
dc.format application/pdf
dc.language.iso spa
dc.publisher Universitat de les Illes Balears
dc.rights all rights reserved
dc.rights info:eu-repo/semantics/openAccess
dc.subject 62 - Enginyeria. Tecnologia
dc.title Seguimiento de obra de una vivienda unifamiliar aislada existente en suelo rústico y nueva planta de piscina
dc.type info:eu-repo/semantics/bachelorThesis
dc.type info:eu-repo/semantics/publishedVersion


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account

Statistics